Beaufort, SC | 1995-1999

Estimated Cost of Construction:

$28,300,000

Project Principals:

Robert DeLoach,

Keith T. O'Neal

BES designed:

  • HVAC

  • Heating/ Hot Water

  • Power Distribution

  • Lighting Systems

  • Fire Protection

  • Site Lighting

  • Plumbing

Received the South Carolina State Energy Conservation Award in 2000

Beaufort Highschool
Beaufort Highschool

Outside front enterance

Beaufort High School entrance
Beaufort High School entrance

Beaufort High School pipes
Beaufort High School pipes

Beaufort Highschool
Beaufort Highschool

Outside front enterance

1/3

Beaufort High School