Beaufort, SC | 1995-1999

Estimated Cost of Construction:

$28,300,000

Project Principals:

Robert DeLoach,

Keith T. O'Neal

BES designed:

  • HVAC

  • Heating/ Hot Water

  • Power Distribution

  • Lighting Systems

  • Fire Protection

  • Site Lighting

  • Plumbing

Received the South Carolina State Energy Conservation Award in 2000

Beaufort Highschool
Beaufort Highschool

Outside front enterance

press to zoom
Beaufort High School entrance
Beaufort High School entrance

press to zoom
Beaufort High School pipes
Beaufort High School pipes

press to zoom
Beaufort Highschool
Beaufort Highschool

Outside front enterance

press to zoom
1/3

Beaufort High School